2018-04-12 Chongqing & Yangtze Cruise (The Three Gorge Dam)
|
|
|

120 views
|
|

119 views
|
|

121 views
|
|

115 views
|
|

123 views
|
|

120 views
|
|

112 views
|
|

124 views
|
|

Arriving at the Three Gorge Dam, we disembarked from our river boat and boarded a bigger ship to reach the Dam.116 views
|
|

125 views
|
|

120 views
|
|

We approched the entrance of an elevator that would take the ship down 370 feet to the other side of the dam.120 viewsThere are two sets of locks, for much bigger ships, one for each direction. There are five locks in each set. It takes about 4 hours to past these locks. The lift would only take about 40 minutes. The caisson (or chamber) is about 390’ by 60’ wide by 12’ deep. The elevator lifts both the ship and the water it floats on some 370 feet. It can carry about 7 million pounds, including ship and water.
|
|
|
|